
Add to Cart
LTD63 / LTD80 MOTOR Steel gondola working platform/ suspended platform/ suspended cradle
Rope Suspended Platform (SRP), also known as Gondola (or cradle or working platform) is being widely used in India for performing various applications at heights for jobs like painting, external wall plastering, installing glass facades, maintenance of external surfaces etc. Most of the contractors have replaced their unsafe scaffolding with safe and reliable Rope Suspended Platforms
Technical Parameters of Suspended Platform :
Specifications | |||
Type | ZLP630 | ZLP800 | ZLP1000 |
Rated Load | 630kg | 800kg | 1000kg |
Lifting speed | 9.3m/min | 8.5m/min | 8.3m/min |
Lifting height | 100m | 100m | 100m |
Hoist | LTD63 | LTD80 | LTD80sdrive |
Voltage-3Phase | 380V(415V/220V) | 380V(415V/220V) | 380V(415V/220V) |
Frequency | 50Hz/60Hz | 50Hz/60Hz | 50Hz/60Hz |
Power | 1.5kw*2 | 2kw*2 | 2.2kw*2 |
Safety Lock | LS30 | LS30 | LS30 |
Electric Control Panel Components | Schneider or CHNT | Schneider or CHNT | Schneider or CHNT |
Platform Sise (LxWxH) | (2+2+2)x0.69x1.18m | (2.5+2.5+2.5)x0.69x1.18m | (2.5+2.5+2.5)x0.69x1.18m |
Steel Wire Rope | 4pcsx100m 4x31SW+FC D=8.3mm | 4pcsx100m 4x31SW+FC D=8.3mm | 4pcsx100m 4x31SW+FC D=8.6mm |
Special Cable | (3x2.0+2x1.0mm2)100m | (3x2.0+2x1.0mm2 )100m | (3x2.0+2x1.0mm2)100m |
Counter Weight | 1000kg | 1000kg | 1000kg |
Parts contains:
1. Platform(basket): Steel (painted or hot galvanized) or Aluminum Alloy
2. Suspension Mechanism: Steel (painted or hot galvanized)
3. Electric hoists: LTD63/LTD80
4. Safety Lock: LS30
5. Electric control box: Along with hoists
6. Steel wire rope: 8.3mm ,8.6mm or 9.1mm
7. Electric cable: 3*2.5+2*1.5
8. Counterweights: Cement , cement with steel cover & Iron counterweight
9 Spare parts
1. Platform(basket): Hot galvanized steel / Aluminum
01.Which payment terms can we accept ?
Normally we can accept T/T, L /C, Western Union, sometimes D/P
1.T/T-----30% down payment is required in advance , 70% balance shall be settteled before
shipment or against the copy of original B/L .
2. L/ C----A 100% irrevocable L /C without "soft clause" can be accepted
02.How long will our price be valid ?
1.The rate of Usd dollars-----RMB varies significantly according to the intemational currency
exchange rates.
2.The cost changed, because of the increasing of labor and material cost
03.What logistics ways can we work for shipment?
1.Mostly we will go by sea, to all main continents such as South America, UAE, India etc by
container.
2.For neiberhood countries of China, such as Russia, we can ship product by train or road.
3.For light spare parts in urgent demand, we can ship them by international service such as
DHL,TNT, UPS or FEDEX.